Portfolio

Perth Causeway and Cycle Bridge

June 2021

Soil Mechanics was engaged by WSP to complete overwater drilling for the proposed Causeway footpath and cycle bridge.

Soil Mechanics drilled 12 x PQ3 boreholes with SPTs and U63 samples. The King George barge was a huge asset to the success of the project, the shallow draft made moving through shallow waters easier and the large deck place provided suitable room and stability on the river.

View More Projects

Menu