December 2020
Soil Mechanics were engaged by GHD to undertake drilling for the APA gas pipeline route from Leinster to Geraldton.
December 2020
Soil Mechanics were engaged by GHD to undertake drilling for the APA gas pipeline route from Leinster to Geraldton.
With over 550m metres of drilling covering the 580 km route. It was a logistical challenge to say the least, crews carried sufficient supplies and were monitored daily via GPS. Soil Mechanics used two small 4×4 mounted pencil auger rigs to cover the pipeline route and DR002 for the sub stations geotech boreholes, the project had a number of river crossings and tough 4×4 tracks.