Portfolio

Broome Waste Facility

October 2020

Soil Mechanics was engaged by Talis Consultants, drilling and installing a number of boreholes with monitoring wells to find a suitable waste storage facility.

Direct push sampling was conducted in the upper lays to capture environmental samples followed by HQ3 coring with SPTs for Geotech and monitoring wells to monitor water levels. Soil Mechanics worked closely with the shire and local aboriginal leaders to ensure minimal disturbance to the land.

View More Projects

Menu