DRILLING SOLUTION
Scope of Work
The project involved geotechnical investigations with piezometers, drilling of various boreholes, and installation of piezometers. It also included pre-drilling for Cone Penetration Test (CPT) boreholes and installation of surface collars. Bulk auger sampling and environmental boreholes were conducted. The project required decontamination of drill strings and downhole tooling after drilling. All equipment was washed down at a client-supplied location. The project also involved drilling from the surface to the top of mangrove muds, with continuous sampling and environmental samples collected as required. All down-hole sampling equipment was de-contaminated onsite. The project also involved various other tasks such as mud disposal and placing a temporary cap/bag over the casing.
Project Information
Job No:
SM0920
Rig:
DR006
Duration: