PORT OF BUNBURY
DRILLING SOLUTION

Project Mission

The mission of the Port of Bunbury project is to:

  • Conduct geotechnical drilling for the development of the new marina within the Port of Bunbury.
  • Obtain crucial geological data to support the construction and development of the marina infrastructure.
  • Ensure the structural integrity and stability of the site to meet safety and regulatory standards.
  • Implement efficient drilling techniques to expedite the data collection process.

“Soil Mechanics completed geotechnical drilling for the new marina located in the port of Bunbury.”

Key Objectives:

 

  • Geotechnical Data Collection: Conduct drilling operations to obtain geological data for engineering design and construction planning.
  • Safety and Compliance: Ensure compliance with safety regulations and standards to protect personnel and the environment during drilling activities.
  • Site Stability Assessment: Evaluate the stability of the site and identify any potential geotechnical hazards.
  • Efficient Operations: Utilise drilling techniques to optimise the data collection process and minimise project timelines.

The Challenge of Project

The Port of Bunbury project faces various challenges, including:

  • Conducting geotechnical drilling in a maritime environment while ensuring minimal disruption to port operations.
  • Achieving accurate geological data collection through various soil layers until reaching competent rock.
  • Ensuring the safety of personnel and equipment during drilling operations, especially in dynamic coastal conditions.
  • Adhering to environmental regulations to minimise the project’s impact on the surrounding ecosystem.
Project Information

Project:

Port of Bunbury

Category:

Infrastructure and Maritime

Date:

January 2019

Address:

Bunbury, Western Australia