DRILLING SOLUTION

Scope of Work

The project involved drilling five HQ3 cored boreholes with a total depth of 38 meters, complemented by standard penetration tests and U-tube in-situ testing at 1.5-meter intervals or as directed. The operation was executed over four shifts, with an additional shift for inspections and reviews. Utilising the DR007 track-mounted rig and BHP WAIO-compliant equipment. Monitoring wells were installed and drill cuttings were disposed of onsite ensuring a streamlined and compliant execution of the geotechnical scope.

Project Information


Job No

SM1280


Rig:

DR007


Duration

20/11/2023 – 26/11/2023